Puma HV and Liners Project

The RC Construction scope of work at Puma HV and Liners required careful execution, planning, and management. Our professional team was prepared to tackle this project head-on and ensure that every part was completed to the highest possible standard. We took great pride in our work and always strive to exceed our client’s expectations, which is why we are confident that the results of this project were nothing short of exceptional. 

Our scope of work in the Puma HV and Liners Project is vast and covers various functions and expertise consisting of the following:

  • Bulk Earthworks
  • Detailed Earthworks and backfill to Heavy Vehicle Roads (Concrete)
  • Supply and Installation of reinforcement (200 Tons)
  • Supply and Installation of Formwork to HV areas
  • Placement of In-situ Structural Concrete (4800m3)
  • Supply and Installation of 32,000m2 of HDPE liner to fuel bunds area
  • Supply and Installation of Asphalt roads, including kerbing

Sami Bitumen Services Import facility

RC Construction scope of work consists of the following:

  • Detailed earthworks, backfilling and compaction
  • Supply and Installation of reinforcement
  • Supply and Installation of Formwork
  • Construction of Pedestals and Pipe Supports
  • In-situ Stormwater Pit Construction
  • Supply and Installation of Structural Concrete Slabs, Ring Beams, Pump Bunds, Tank foundations (1100m3)
  • Manufacturing and Installation of precast bund walls

PUMA Energy Bitumen Import

RC Construction scope of work consists of the following:

  • Detailed earthworks, backfilling and compaction
  • Supply and Installation of reinforcement (450 Tons)
  • Supply and Installation of Formwork
  • Construction of Pedestals and Pipe Supports
  • In-situ Stormwater Pit Construction
  • Supply and Installation of Structural Concrete Slabs, Gantries, Pump Bunds, Tank foundations, Concrete hardstand, Filtration Basin (4800m3)
  • Manufacturing and Installation of precast bridge planks including Abutment construction
  • Manufacturing and Installation of precast bund walls
  • Asphalt, Line Marking and Signage Works.

Terminal A Tank Farm

RC Construction scope of work consists of the following:

  • Detailed earthworks, backfilling and compaction
  • Supply and Installation of footing and wall reinforcement (600 Tons)
  • Supply and Installation of Formwork (7200 m2)
  • Construction off Pedestals and Pipe Supports
  • In-situ Stormwater Pit Construction
  • Supply and Install of Drainage
  • Supply and Installation of Structural Concrete (7500m3)

Terminal A Ring Beams

RC Construction scope of work consists of the following:

  • Detailed earthworks
  • Supply and Installation off ring beam reinforcement (200 Tons)
  • Supply and Installation off Radius Formwork (1700 m2)
  • Supply and Installation off Polylock (1400 m)
  • Supply and Installation off Structural Concrete (1500m3)

Kwinana Bitumen Terminal

West Tank Terminal Extension


RC Construction scope of work consists of the following:

  • Bulk Earthworks (18000m3)
  • Detailed earthworks, backfilling and compaction
  • Supply and Installation of reinforcement (400 Tons)
  • Supply and Installation of Formwork
  • Supply and Installation of HDPE Liners
  • Supply and Installation of Earthshield Waterstop
  • Construction of Pedestals and Pipe Supports
  • In-situ Stormwater Pit Construction
  • Supply and Installation of Structural Concrete Slabs, Ramps, Gantries, Ring Beams, Tank foundations, Pumping Slabs (2900m3)
  • Design and construction of precast Wall Segments
  • Supply and Installation of Armco Barriers