Sami Bitumen Expansion Project

Aerial Photos of project under construction

The scope of work for RC Construction is comprehensive and mixed, containing a range of essential activities to ensure that the Sami Bitumen Expansion project is executed to the highest standard. These activities include detailed earthworks and backfill to all structures. This work is essential to guarantee the strength and durability of the foundations for all buildings and associated structures. Besides, RC Construction will undertake the vital work of supplying and installing facilities reinforcement, totalling an impressive 320 tons. Ensuring the project’s structural integrity is paramount, and RC Construction is committed to delivering this essential component effectively and to the highest standard.

Furthermore, the team at RC Construction will also install Formwork to all structures and undertake the placement of In-situ Structural Concrete, amounting to over 2100m3. These activities are fundamental to the project’s success and represent RC Construction’s commitment to delivering high-quality and attention to detail.

RC Construction’s scope of work consists of the following:

  • Detailed Earthworks and backfill to all structures
  • Supply and Installation of structures reinforcement (320 Tons)
  • Supply and Installation of Formwork to all structures
  • Placement of In-situ Structural Concrete (2100m3)

KML Stacker Project

pouring concrete with metal foundation

The RC Construction scope of work at the KML Stacker Project is extensive and involves multiple tasks required for the project’s success. The first task is bulk earthworks, which include preparing the construction site by removing leftover soil and debris. The second task is detailed earthworks and backfill to all structures, which involves the creation of foundations and ensuring that they are properly secured before building on top of them.

Thirdly, the scope of work includes the supply and installation of structures reinforcement, a critical step in ensuring the structures remain stable over time. The project also needs the supply and installation of formwork for all structures, which involves the design of temporary moulds into which concrete will be poured and allowed to be set.

Finally, the project will also involve the arrangement of in-situ structural concrete. This consists in pouring concrete on site to create the necessary structures. Altogether, the various tasks outlined in the RC Construction scope of work at the KML Stacker Project demonstrate the complexity of the project and the expertise required to complete it successfully.

RC Construction’s scope of work at KML Stacker Project consists of the following:

  • Bulk Earthworks
  • Detailed Earthworks and backfill to all structures
  • Supply and Installation of structures reinforcement (120 Tons)
  • Supply and Installation of Formwork to all structures
  • Placement of In-situ Structural Concrete (1250m3)

KML Filtration Plant Project

RC Construction company is a leading company in construction and civil engineering projects. This post will give you an overview of our scope of work for one of our projects: the KML Filtration Plant Project.

The KML Filtration Plant Project is a large-scale infrastructure project that aims to provide water supply and hydroelectric power to the region.

RC Construction was responsible for the following tasks in the project:

  • Bulk Earthworks
  • Detailed Earthworks and backfill to all structures
  • Supply and Installation of structures reinforcement (600 Tons)
  • Supply and Installation of Formwork to all structures
  • Manufacturing and Installation of all Precast Components
  • Placement of In-situ Structural Concrete (3500m3)
  • Supply and installation of electrical conduits and switch rooms

Our team is committed to providing high-quality work within budget and schedule. We have a team of professional engineers, technicians, and workers who are trained in safety and environmental standards. We use state-of-the-art tools and technology to ensure efficiency and accuracy. We also cooperate closely with our clients and stakeholders to ensure their satisfaction and expectations are met.

Marvel Loch OHP Upgrade

Marvel Loch Tanks

Yandi Upgrade

RC Construction scope of work consists of the following:

  • Detailed earthworks, backfilling and compaction
  • Supply and Installation of reinforcement
  • Supply and Installation of Formwork
  • Placement of Structural Concrete Slabs

Pilgangoora Lithium

RC Construction scope of work consists of the following:

  • Supply and Installation of reinforcement
  • Supply and Installation of Formwork including 25m high stacker pedestals
  • Construction of conveyor Footings and Pedestals
  • In-situ drive in sump Construction
  • Placement of Structural Concrete (1200m3)

CHF Backfill

RC Construction scope of work consists of the following:

  • Detailed earthworks, backfilling and compaction
  • Supply and Installation of reinforcement
  • Supply and Installation of Formwork
  • Construction of Pedestals and Pipe Supports
  • In-situ sump Construction
  • Placement of Structural Concrete Slabs, Pump Bunds, Tank foundations, Plinths (900m3)

Alcoa Pinjarra MCC

RC Construction scope of work consists of the following:

  • Installation of reinforcement
  • Supply and Installation of Formwork to footings, slabs and columns
  • Placement of substation In-situ Structural Concrete.

Overpass Tunnel

RC Construction scope of work consists of the following:

  • Installation of reinforcement (180 Tons)
  • Supply and Installation of Formwork to footings and arches
  • Placement of In-situ Structural Concrete (1200 m3)
  • In-situ Construction of tunnel arches