Dalwallinu 2ML Water TankInfrastructure
RC Construction scope of work consists of the following:
- Installation off reinforcement (180 Tons).
- Assembly and Installation off Radius Formwork
- Placement off In-situ Structural Concrete (1400 m3)
- Manufacturing and Installation off Precast Columns and Beams
- Construction off associated pumping structures
Client: DMC Civil
Owner: Water Corporation
Scope: Concrete Works Package
Location: Dalwallinu, Western Australia.