Dalwallinu 2ML Water TankInfrastructure

RC Construction scope of work consists of the following:

  • Installation off reinforcement (180 Tons).
  • Assembly and Installation off Radius Formwork
  • Placement off In-situ Structural Concrete (1400 m3)
  • Manufacturing and Installation off Precast Columns and Beams
  • Construction off associated pumping structures

Client: DMC Civil

Owner: Water Corporation

Scope: Concrete Works Package

Location: Dalwallinu, Western Australia.