Puma Energy – HV / LV Project

RC Construction secures a construction package on the Puma Energy Fuel Terminal (Kwinana – Western Australia). The package includes detailed excavations, bitumen road construction, 3500m3 concrete roadways, filtration basins, drainage and finishing works. RC Construction looks forward to delivering this Project direct to Puma Energy Limited. Works commence in January 2022 and will continue until July 2022.